x

Campus Construction Updates

Clarkson College is continually growing and enhancing our campus to better serve students and the community.

We’re updating spaces for better accessibility, modern learning, and a more vibrant campus experience. Explore our latest construction projects, recent upgrades, and what’s on the horizon for our campus. Check back for periodic updates as more information becomes available.

Recent Updates

Updates as of May 27, 2026:

June into July will feature several changes to entrance access.

Timeframe What’s Happening What You Should Do
June 1 to June 19 The patio area between the Main Building and Student Center will be closed for concrete pouring. Use the alley near the South parking lots or the route along Dodge Street. Follow all posted signage and safety directions.
Starting June 22 Concrete work at the temporary Main Building entrance on 42nd Street. Use the Welcome Center (south entrance of the South Building) as the main entry point. The skywalk across 42nd Street will remain available to staff and students.

Starting June 1st: Make note of the entrance changes pictured below.

map_asofJune1.png

View the updated printable map for June 1 to 19, 2026.


Updates as of May 15, 2026:

Summer construction season is in full swing. Construction is still on progress to have the following areas operational at the start of Fall 2026 semester:

  • Welcome Center (our new main entrance)
  • the Courtyard
  • Clarkson College South Building including 3D Printing, Professional Development, PTA classrooms, etc.
  • and the Link (connecting the Main and South Building)

If you have been on campus this week, you will also see a walking bridge constructed that connects the path between the Student Center and the Main Building. This is temporarily in place while work is completed to ensure a complete water seal for the foundations of the Link and South Building as well for foundational work for the Link.

Thank you for your continued patience as construction progresses and your adherence to safety while on campus.


Questions?

Contact us

  • Front Desk — 402.552.3100
  • Professional Development 
    — 402.552.3396 or 402.552.6148
  • Campus business hours are 8:00 AM to 4:30 PM on weekdays.
  • Online contact us form

Current Campus Map

Plan ahead for your trip to campus.

Our updated campus map includes all the latest details, including areas affected by construction, building locations, and the best paths to get around. Wayfinding routes are marked to help you navigate easily and safely.

Click here to view the map updated for June 1 to June 19, 2026.

Click here for a printable PDF map.

Campus Map 2025-10-01.png

Professional Development & Community Learners

If you are participating in a Professional Development course which includes time on campus, you will be provided instructions about where to park and what entrance to use. Please follow the instructions provided and reach out to our Professional Development team with questions: 402.552.3396 or 402.552.6148.

Professional Development courses include:

  • Life Support and CPR Courses (BLS, ACLS, PALS, Heartsaver CPR/AED, Heartsaver Total,
    Heartsaver Pediatric First Aid)
  • Healthcare Certifications (Nurse Aide (CNA), Medication Aide (CMA), Medical Assistant)
  • Continuing Education

About Our Construction Projects

Rendering of banners along 42nd Street south building.

The Welcome Center and Link construction project officially kicked-off Monday, June 2nd with a groundbreaking celebration. We were excited to welcome guests to campus and share our vision for what is to come.

Thank you for your support as we together navigate the construction process.

Learn more.